Section 5 Declaration in Ireland: Get the Council to Confirm Your Works Are Exempt

Last updated:

If you are not sure whether an extension, dormer or garden building needs planning permission, you can ask the council to decide. A Section 5 declaration gives you a formal written answer, and it is useful evidence when you sell.

Get your project checked

What a Section 5 declaration is

Under Section 5 of the Planning and Development Act 2000, anyone can ask the planning authority whether a particular development is “development” and whether it is exempted development. The council’s answer is a formal declaration that applies to the drawings and description you submit.

Cost and timeline

Most councils charge a statutory fee of €80 and aim to decide within four weeks, although they can ask for further information first. If you disagree with the decision, you can refer it to An Coimisiún Pleanála within four weeks, for a further fee.

What you need to submit

Requirements vary slightly by council, but typically include:

  • The council’s Section 5 application form (many have updated it for the 2026 regulations).
  • A site location map and site layout plan.
  • Dimensioned floor plans and elevations, existing and proposed, usually at 1:50, 1:100 or 1:200.
  • Floor areas, including any previous extensions.
  • A clear description of the works and which exemption class you rely on.
  • The €80 fee.

When it is worth applying

A declaration is worth the cost when your design is close to a limit, when an earlier extension makes the floor-area count unclear, when a neighbour is likely to object, or when you plan to sell or remortgage soon. Poor drawings are the main reason applications come back with further information requests or a “not exempt” decision.

If the answer is “not exempt”

You can redesign to meet the conditions and apply again, refer the decision to An Coimisiún Pleanála, or apply for planning permission. Do not start works the council has declared not exempt.

Your checklist before starting

  • Decide which exemption class your works rely on.
  • Prepare dimensioned existing and proposed drawings and a site layout.
  • Download your council’s current Section 5 form.
  • Submit with the €80 fee and wait about four weeks.
  • Keep the declaration with your property documents.

Common questions

How much does a Section 5 declaration cost?

The council fee is €80. Professional drawings to support the application are extra.

How long does a Section 5 take?

Councils usually decide within four weeks of a valid application, longer if they request further information.

Can I appeal a Section 5 decision?

Yes. You can refer it to An Coimisiún Pleanála within four weeks of the decision, on payment of a fee.

Can HomeUpgrade help with a Section 5 application?

Yes. Describe your project and, with your permission, DOD Construction Technical Services can review it and quote for the drawings and application where suitable. Fees are agreed before any work starts.