When you need it
You need retention permission when development was carried out that was not exempt and did not have permission, or did not follow the permission granted. Typical examples are an extension over the exempt limits, a side extension, a converted attic with front dormers, or a garden building used as a separate home.
First check whether it was actually exempt
Many older extensions and garden buildings were exempt when built. If the work met the exemption conditions in force at the time, a Section 5 declaration or an engineer’s opinion on compliance may be enough, and is cheaper than a retention application.
The process and fees
Retention applications follow the same steps as a normal application: newspaper and site notices, a five-week submission period, an eight-week decision and a four-week appeal window. The fees are higher:
- Extensions and other domestic works: €102, or €2.50 per m², whichever is greater.
- A house: €195, or €2.50 per m², whichever is greater.
What if retention is refused?
The council can refuse retention just as it can refuse a normal application. The unauthorised work can then be the subject of enforcement, which may require it to be altered or removed. Get professional advice on the strength of the case before applying.
Planning is only half of it
Buyers and lenders usually also want evidence that the work complied with Building Regulations. Retention permission does not certify the construction. An engineer or architect may need to inspect and certify the work separately.
Your checklist before starting
- Establish when the work was done and what the rules were at the time.
- Check whether it was exempt; if so, consider a Section 5 declaration instead.
- Get measured drawings of the work as built.
- Lodge a retention application with the correct notices and fee.
- Arrange a separate Building Regulations compliance opinion if selling.
Common questions
How much does retention permission cost in Ireland?
For an extension or other domestic works the council fee is €102 or €2.50 per m², whichever is greater. Professional fees for drawings are extra.
Can I sell a house with an extension that has no planning permission?
Possibly, but buyers’ solicitors and lenders usually require it to be regularised first, through evidence of exemption, a Section 5 declaration or retention permission.
Is retention permission harder to get than normal permission?
The council assesses it on the same planning grounds, but you cannot redesign what is already built without works, so problems are harder to fix.
Related guides
Official sources
- Fingal County Council: planning application and retention fees
- Kilkenny County Council: timelines for planning permission
- Dublin City Council: Section 5 declarations
General information only, not a professional assessment or official planning determination. Exemptions apply only when every condition is met and can change. Check with your local authority and an appropriately qualified professional before starting works.