What changed, at a glance
Seven new regulations amended the exempted development classes for houses. The main changes for homeowners are:
- Rear extensions: the limit rose from 40 m² to 45 m² in total, including earlier extensions built since 1 October 1964.
- Upstairs windows in an extension now need to be 8 m from the boundary they face, down from 11 m.
- Dormers: a dormer to the side or rear of the house is now exempt up to 30 cubic metres, if it stays below the ridge and is set back at least 20 cm from the eaves.
- Front rooflights: up to two, each no larger than 100 cm × 90 cm.
- Sheds, garden offices and garages: the combined limit rose from 25 m² to 30 m².
- Granny flats and garden homes: a new exemption for a detached home of 32 m² to 45 m² in the rear garden, until 31 December 2030.
- Splitting a house into two homes: a new exemption, each unit at least 32 m², until 31 December 2030.
- Heat pumps no longer have to be at the rear, and external wall insulation up to 150 mm thick is exempt on front, rear and gable walls.
- Bike and bin stores up to 3.5 m² and 1.4 m high, front or rear.
Exempt does not mean “no rules”
An exemption only applies when every condition in the class is met. Miss one, such as the wall height or the 25 m² of open space you must keep, and the whole project needs planning permission. Building Regulations, fire safety and Building Control rules apply either way. The exemptions also do not apply in these situations:
- The house is a protected structure, or the works would affect its character.
- The property is in an Architectural Conservation Area or Special Amenity Area Order area where the works would affect its character.
- A condition in an earlier planning permission for the house or estate restricts the works.
- The works would create or widen an access onto a public road, endanger traffic safety or obstruct a public right of way.
- The site needs an environmental or appropriate assessment.
Two new exemptions need you to notify the council
For a garden home (Class 3A) or splitting a house into two units (Class 1A), you must notify your planning authority at least 14 days before work starts. The notice gives the location and Eircode, confirms the site meets the regulations and states why you are using the exemption. Some councils, including Kilkenny, have published a notification form. Works under both classes must start and finish by 31 December 2030.
Keep evidence: it matters when you sell
Buyers’ solicitors and lenders may ask for evidence that works done without planning permission were genuinely exempt. Keep dimensioned drawings, photos, any council notification and, where the position is borderline, a Section 5 declaration from the council confirming the works are exempt.
When to get a professional check
Measure first. If your design is close to any limit, has an upstairs element, a previous extension, a gable wall or an unusual site, get a technical review before ordering materials. Councils are already refusing exemptions on the detail: in October 2026 a council ruled that a 41 m² rear extension was not exempt because its walls would be taller than the house’s rear wall.
Your checklist before starting
- Identify which class your project falls into (extension, dormer, shed, garden home or subdivision).
- Measure existing extensions, garden structures and remaining open space.
- Check protected status, conservation areas and conditions in earlier permissions.
- Have the design checked against every condition, or apply for a Section 5 declaration (€80).
- Notify the council 14 days before starting if you are using Class 1A or 3A.
- Keep drawings, photos and any declaration for when you sell or remortgage.
Common questions
When did the new planning exemptions start?
Monday 27 July 2026. Works started before then were assessed under the previous rules.
Can I now build a 45 m² extension without planning permission?
Only at the rear, and only if the 45 m² total includes any extensions built since 1 October 1964 and every other condition is met (height, boundaries, windows and 25 m² of remaining open space). Above ground level the limits remain 12 m² for terraced and semi-detached houses and 20 m² for detached houses.
Do the new exemptions apply to apartments?
No. The house classes apply to houses. Apartments and duplexes generally need permission for external changes.
How can I get the council to confirm my project is exempt?
Apply for a Section 5 declaration. Most councils charge €80 and aim to decide within four weeks.
Related guides
Official sources
- South Dublin County Council: new exemptions from 27 July 2026 (all seven regulations)
- S.I. No. 338 of 2026: Class 1 extensions (45 m²) and Class 3 garden structures (30 m²)
- S.I. No. 344 of 2026: Class 1B dormers and Class 1C front rooflights
- S.I. No. 340 of 2026: Class 3A detached house in a rear garden
- Kilkenny County Council: exempted development, Section 5 and Class 1A/3A notification forms
- Department of Housing: consolidated Planning and Development Regulations 2001–2026
General information only, not a professional assessment or official planning determination. Exemptions apply only when every condition is met and can change. Check with your local authority and an appropriately qualified professional before starting works.